Skip to main content
Loading…
This section is included in your selections.

Upon completion of the installation of air infrastructure improvements, two copies of infrastructure as built plans shall be filed with the City Superintendent. The maps shall show information required by the City Superintendent, but not limited to location of all utilities, sewer grades, manholes, fire hydrants, storm sewer main size and location, and catch basin location. The City shall withhold final acceptance of the utility installation until the as built drawings are filed.