Skip to main content
Loading…
This section is included in your selections.

A. Lots shall be graded so as to provide positive drainage away from all buildings and individual lot drainage shall be coordinated with the proposed storm drain pattern of the area. Stormwater runoff from individual lots shall be detained and treated on-site, so that the general storm drainage pattern in the area will not be disrupted.

B. In areas where on-site stormwater detention and/or treatment system are not possible, an adequate storm sewer system including necessary pipes, culverts, catch basins and any other necessary appurtenances shall be provided for the proper drainage of surface water. The inflow of storm waters into sanitary sewers shall be prohibited.

C. Detention basins shall be designed to be in character with the existing landscape and topography so as to blend in with the visual landscape.

D. The requirements for installation of storm sewer drainage may be waived upon approval by the City Council and City Superintendent.